LUSOLOBO
  • Home
  • Pixels
  • About
  • Contact Us
  • Notes
  • Menu Menu

Tag Archive for: stations

Blog

Underground

In Lisbon’s metro, you can find art under your feet

The construction of the Metropolitana de Lisboa started in August 1955. The initial line consisted of 6,5 kilometers and comprised 11 stations and two-carriage trains. Nowadays there are four Lines (Blue, Green, Yellow, and Red) with a total of 56 stations. It certainly isn’t a punishment to travel in Lisbon’s underground. Some stations will surprise you with their impressive architecture.

The Olaias station was inaugurated in 1998 to serve Expo’98 visitors. Situated between Alameda and Bela Vista the station is part of the Red Line. It is considered one of the most beautiful in the world. The architect Tomás Tavira designed an imposing station with high pillars in industrial style and many colors, both on the platform and throughout the route that passengers take to enter or exit the metro.

The Jardim Zoológico station, situated between Laranjeiras and Praça de Espanha, is part of the Blue Line and one of the first metro stations in the capital. It used to be called Sete Rios after the square under which it is located.
The artistic interventions are by Júlio Resende, who decorated the station with cave paintings referring to animals present in the Lisbon Zoo.

Another pioneering station on the blue line is Parque in the Parque Eduardo VII area and situated between the stations São Sebastião and Pombal.  After its inauguration in 1959, the station was completely remodeled in 1994 by Francoise Schein and Frederica Matta, who worked on the theme of the Portuguese Discoveries, using shades of blue painted tiles.

The Campo Grande station integrates two lines, the Yellow and the Green Line. It opened in 1993 and is the first station built on a viaduct. From there one can easily reach the Faculty of Sciences of the University of Lisbon. The interventions on its walls were carried out by Eduardo Nery, who chose Portuguese tiles arranged unconventionally.

At present, the Metropolitano de Lisboa is expanding its network with an extension of the Red Line between São Sebastião and Alcântera and the construction of a new – Violet – Line between Odivelas and Loures.

The two kilometers long circle line connecting the Yellow Line to the Green Line and whose excavation was completed last month will include two new metro stations Estrela (Star) and Santos ( Saints). The names are promising. Let’s see whether these stations will be as beautifully decorated as the ones mentioned above.


Happy Easter                         Feliz Páscoa             (pic Ptnews/Público)















April 6, 2023/by admin
https://lusolobo.com/wp-content/uploads/2023/04/Foto-Blog-Underground.jpg 1287 1820 admin https://lusolobo.com/wp-content/uploads/2022/12/logo-lusolobo-3-300x184.png admin2023-04-06 11:18:352026-10-07 20:06:32Underground
Recent
  • UnaffordableNovember 8, 2026 - 1:46 pm
  • VhilsOctober 20, 2026 - 9:11 am
  • GlazigOctober 19, 2026 - 5:31 pm
  • OffalOctober 6, 2026 - 2:58 pm
Comments
Tags
addiction Africa art children climate change CO2 corruption Covid19 Democracy discrimination economy education elections emigration environment EU exposition food historic history housing human rights Inequality Lisbon migration morbidity mortality origin painter plastic politics pollution population Portugal Portuguese racism Refugees slavery SNS strike tourism violence waste wildfires women

Interesting links

Ten reasons to visit Portugal

Beautiful towns

Ultimate road trip

Porto, second to none

Secrets of Monsanto

Best Algarve beach

7 Road trips

Hidden spots in Lisbon

Wandeltochten ( in Dutch)

Pages

  • About
  • Contact Us
  • Home
  • Pixels

Categories

  • Blog
  • Notes
  • Pixels

Archive

  • November 2026
  • October 2026
  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • April 2016
© Copyright - Lusolobo
  • Link to X
Scroll to top Scroll to top Scroll to top